← All Pinal County cases · Every Phoenix P&Z portal we watch
PA-010-26 — Green Energy Production for Utility Scale Solar (PV) and Battery Energy Storage System (BESS) in Pinal County, AZ
Verdin Solar LLC requested a Major Comprehensive Plan Amendment to redesignate 2,562± acres from Very Low Density Residential and Proposed Open Space to accommodate 1,500± acres of utility-scale solar photovoltaic and battery energy storage facilities, plus 1,062± acres of Proposed Open Space. This case has been withdrawn.
| Case number | PA-010-26 |
|---|---|
| Type | Comp Plan Amendment |
| Location | Portions of sections 13, 14, 15, 22, 23, 24 and 25, T10S, R08E, Gila and Salt River Base and Meridian, approximately eight miles southwest of Red Rock and Interstate 10, unincorporated Pinal County |
| County | Pinal County |
| Acreage | 2562.0 |
| Current zoning | Very Low Density Residential (VLDR, 0-1 du/ac) and Proposed Open Space |
| Proposed use | Green Energy Production for Utility Scale Solar (PV) and Battery Energy Storage System (BESS) |
| Petitioner | Verdin Solar LLC |
| Owner | Arizona State Land Department |
| Hearing | 2026-08-20 |
| Hearing body | Pinal County Planning & Zoning |
| Record | Updated after it was first seen; not a decision |
The summary and fields above are read automatically from the agenda packet, so they can be wrong or incomplete — the packet itself is the record. Tell us if something here is wrong.
Property & nearby activity
Case history
Every time this case appeared on an agenda we watched, and what changed.
- Hearing scheduled — 2026-07-16: Hearing moved earlier, to 2026-07-16 · Pinal County Planning & Zoning
- First seen — 2026-09-28: First seen on a Pinal County Planning & Zoning agenda · Pinal County Planning & Zoning
- Continued — 2026-08-20: Continued from 2026-07-16 to 2026-08-20 · Pinal County Planning & Zoning
Also on the 2026-08-20 Pinal County agenda
- PD-017-25 — PD Amendment
- PZ-PD-006-26 — PD Amendment
- PA-015-26 — Arizona Independent Technology Campus (data centers)
- PA-012-26 — Utility scale photovoltaic solar generation facility and Battery Energy Storage System (BESS)
Other Pinal County rezoning cases
Tracking this case? P&Z Radar emails you when cases like this appear on a covered Phoenix P&Z agenda — ahead of the hearing where the city posts ahead. Start a free trial.
Pip
P&Z Radar AI agent · Expand
Hi, I’m Pip. How can I help?