← All Pinal County cases · Every Phoenix P&Z portal we watch
PZ-002-26 — Battery Energy Storage System (BESS) facility in Pinal County, AZ
Rezoning of approximately 25 acres from General Rural/Single Residence to Industrial zoning to permit a Battery Energy Storage System (BESS) facility at the southwest corner of Bella Vista Road and Attaway Road in San Tan Valley. The property comprises two tax parcels in an incorporated area of the Town of San Tan Valley.
| Case number | PZ-002-26 |
|---|---|
| Type | Rezoning |
| Location | Southwest corner of Bella Vista Road and Attaway Road, San Tan Valley, Arizona |
| County | Pinal County |
| Parcel / legal | Section 24, Township 03 South, Range 08 East, Gila River and Salt River Base and Meridian, tax parcels 210-24-001N and 210-24-001G |
| Acreage | 25.0 |
| Current zoning | General Rural (GR) and Single Residence (CR-3) |
| Requested zoning | Industrial (I-3) |
| Proposed use | Battery Energy Storage System (BESS) facility |
| Petitioner | Copper Basin Energy Storage LLC (applicant); Joe Horn from Colliers Engineering & Design (agent) |
| Owner | 8159 E. Bella Vista LLC, John O. Nevitt, Nevitt Farms LLP, Adrienne Call, John O. Nevitt, Monte A. Nevitt, Edward O. Nevitt, Jr, Copper Basin Energy Storage LLC |
| Hearing | 2026-05-21 |
| Hearing body | Pinal County Planning & Zoning |
| Record | First seen on an agenda; not a decision |
The summary and fields above are read automatically from the agenda packet, so they can be wrong or incomplete — the packet itself is the record. Tell us if something here is wrong.
Property & nearby activity
Case history
Every time this case appeared on an agenda we watched, and what changed.
- First seen — 2026-09-28: First seen on a Pinal County Planning & Zoning agenda · Pinal County Planning & Zoning
Also on the 2026-05-21 Pinal County agenda
- PZ-PD-002-26 — PD Amendment
- PZ-PA-003-26 — 250-Megawatt (MW) / 2000-Megawatt Hour (MWh) Battery Energy Storage System (BESS)
- PD-002-26 — Energy storage facility (Copper Basin Energy Storage)
- PA-003-26 — 250-Megawatt (MW)/2000-Megawatt Hour (MWh) Battery Energy Storage System (BESS)
Other Pinal County rezoning cases
Tracking this case? P&Z Radar emails you when cases like this appear on a covered Phoenix P&Z agenda — ahead of the hearing where the city posts ahead. Start a free trial.
Pip
P&Z Radar AI agent · Expand
Hi, I’m Pip. How can I help?