← All Peoria cases · Every Phoenix P&Z portal we watch

21-153 — Utility-scale battery energy storage system (BESS) with supporting infrastructure including battery enclosures, inverters, transformers, on-site substation, and perimeter screening in Peoria, AZ

Barrel Cactus Energy Storage LLC seeks to amend the Legacy Point Planned Area Development to permit a 13.84-acre battery energy storage system (BESS) with supporting infrastructure. Located in an industrial corridor with existing utility connections, the facility poses minimal impacts to residential areas (over 1,500 feet away) and municipal services.

Case number21-153
TypePD Amendment
LocationNorthwest of N. 75th Avenue and W. Butler Drive, Peoria, AZ (Maricopa County Assessor's Parcel No. 142-20-158)
CountyMaricopa County
Parcel / legalMaricopa County Assessor's Parcel No. 142-20-158
Acreage13.84
Current zoningLegacy Point PAD (Planned Area Development)
Proposed useUtility-scale battery energy storage system (BESS) with supporting infrastructure including battery enclosures, inverters, transformers, on-site substation, and perimeter screening
PetitionerBarrel Cactus Energy Storage LLC
OwnerPHI PLP 13 LLC
Hearing2026-08-20
Hearing bodyPlanning and Zoning Commission Meeting
Statusnew

View the source agenda PDF →

The summary and fields above are read automatically from the agenda packet, so they can be wrong or incomplete — the packet itself is the record. Tell us if something here is wrong.

Property & nearby activity

Case history

Every time this case appeared on an agenda we watched, and what changed.

Also on the 2026-08-20 Peoria agenda

Other Peoria rezoning cases

Tracking this case? P&Z Radar emails you when cases like this appear on a covered Phoenix P&Z agenda — ahead of the hearing where the city posts ahead. Start a free trial.