Barrel Cactus Energy Storage LLC — zoning filings

2 tracked case(s) across 1 city (Peoria). Hearing dates and full case detail below.

CountiesMaricopa
Most active inPeoria (2)
Typical filingsPD Amendment (2)
Proposed usesUtility-scale battery energy storage system (BESS) with supporting infrastructure including battery enclosures, inverters, transformers, on-site substation, and perimeter screening, Battery Energy Storage System (BESS) - 120 MW / 960 MWh capacity with on-site substation
Activity2026-08-20 → 2026-08-20
Want the next one when it files? Add Barrel Cactus Energy Storage LLC as a keyword and P&Z Radar emails you when they appear on a covered agenda — ahead of the hearing where the city posts ahead. Start a free trial.
CaseCityProposed useHearing
21-153PeoriaUtility-scale battery energy storage system (BESS) with supporting infrastructure including battery enclosures, inverters, transformers, on-site substation, and perimeter screening2026-08-20
Z21-06A.2PeoriaBattery Energy Storage System (BESS) - 120 MW / 960 MWh capacity with on-site substation2026-08-20